Category: <span>Trail work</span>

I have a scheme in mind: temporarily mark alternative lines through some selected rock gardens to provide fresh challenges to riders who are bored with riding through them the same way all the time. I’m calling them ‘sections’ since that’s the term most often used in mototrials events.

Leb rock garden alternative line - start Leb rock garden alternative line - finish

I’ve marked these photos with a red line to indicate an example of a short alternative line (viewed from the start and looking backwards from the finish) through a rock garden at Lebanon Hills.

I started thinking about this when I went rocking climbing a couple weeks ago at Vertical Endeavors with one of my sons. He told me that they change some of the color-coded climbs each month in order to keep things interesting for the advanced regulars.

How to mark the lines? Ideas thus far:

  • flags
  • chalk
  • colored stones/pebbles
  • tape
  • washable paint/spray chalk

rocks marked with a chalk lineMy inclination is to experiment first using small colored flags to mark the start and finish of a section and railroad chalk to mark the approximate line through the rocks. I want to avoid doing anything that would bother land managers, make things more difficult for dirt bosses/trail workers, or make riding needlessly more dangerous (e.g. stakes or other markers that could impale a tire or body part).

The sections would be publicized with photos and/or video in the MORC forum as well as via Twitter and Facebook.  Riders would be invited to discuss the sections, brag about their successes, whine about their failures, share photos and videos, etc. And then a month or two later, the sections would be changed to something else. Others could volunteer to set them up.  If this works with rock gardens, then it might be worth trying with other technical obstacles.

To explain a section to riders who discover it while out riding the trail, we could print a photo or two showing the alternative line, laminate them and tack them up on a stake or nearby tree with a little sign that says “Try this!”  We could also put up a QR code near the entrance of a section and link it to a web page with photos and videos. Riders with smartphones could then see what it’s all about.

I ran this idea past some of the Lebanon Hills Dirt Bosses last week and they seemed to like it. So I plan to start the experiment there.

What might the pros and cons of this idea be, especially the possible unintended consequences? Want to help? Attach a comment.

Trail work

Lori Reed and Jesse Livingston IMBA Trail Care Crew logo C.J. Smith, Jesse Livingston, Lori Reed, Jay Thompson, Reed Smidt

Lori Reed and Jesse Livingston, the current members of the Subaru/IMBA Trail Care Crew, came to the Twin Cities last Friday at MORC‘s invitation for a weekend of their education program on sustainable mountain bike trail building practices.  I caught up with them for a bit of socializing on Friday night at Dick’s Bar & Grill in Osseo after their session in Monticello with some metro area land managers. L to R in photo above: Elm Creek Singletrack Dirt Boss C.J. Smith, Jesse Livingston, Lori Reed, Elm Creek Dirt Boss and MORC board member Jay Thompson, and MORC president Reed Smidt.

Jesse Livingston IMBA Trail Building School, classroom session, Monticello MN

Lori Reed Clay Haglund, Lori Reed, Troy David Grieves, Jesse Livingston
They did their one-day IMBA Trail Building School on Saturday for a couple dozen MORC members. The 3-hour classroom session in the morning focuses on:

  • IMBATrail Care Crew Quick Reference GuideTrail building theory
  • Essential elements of sustainable trails
  • Designing a trail
  • Constructing the trail
  • Rerouting and reclaiming trails
  • Advanced trail construction techniques

Since I started mountain biking in 2011, I’ve showed up to help a bit on a few local trail work sessions (2013 sessions here, here, here, and here) but I’ve been mainly a clueless laborer who retreated behind a camera whenever I got tired.  I took this IMBA Trail Building School because I wanted to have at least a beginning understanding of the art and science involved. As a newbie, I came away very pleased with the experience.  I thought their rapid-fire presentation in morning session was well done: lots of photos and videos, a few quizzes, hands-on with a clinometer, and thankfully, no Powerpoint slides of deadly text-only bullet points.

IMBA Trail Care Crew with MORC members Lori Reed and Jesse Livingston

Rhett Williams, Matthew Bailey, Jeff Leech MORC members with the IMBA Trail Care Crew
The afternoon field session was held at the Bertram Lakes Singletrack near Monticello.  After a quick demo by Jesse, we divided up into 3 teams of 8, each led by a MORC dirt boss (my team was headed up by Jeff Leech).  It was very helpful to have the hands-on experience and coaching. I don’t know how many feet of trail the crews created but I think we more than marginally adequate as we finished early.

MORC group ride at Elm Creek Singletrack with Jesse and Lori MORC/Elm Creek dirt boss C.J. Smith

MORC group ride at Elm Creek Singletrack with Jesse and Lori Jesse Livinston, Lori Reed, Reed Smidt
On Sunday morning, a group of us did a group ride with Lori and Jesse at Elm Creek Singletrack led by local Dirt Boss C.J. Smith.  ‘Twas a fast, flowy ride on a gorgeous autumn-like day and a fitting send-off.

You can follow Lori and Jesse on their IMBA Trail Care Crew blog (they have a blog post up about the weekend titled They Still Got It), their @Subaru_IMBA_TCC Twitter feed, and their IMBA Trail Care Crew Facebook page.

See my album of 40+ photos (large slideshow, recommended) or SLOW CLICK this small slideshow:

Organizations Photo album Trail work

Reed Smidt, Jeff Leech, Porter Million, Drew Diller Porter Million,  Jeff Leech, Reed Smidt, Drew Diller Jeff Leech, Porter Million, Reed Smidt, Drew Diller
To the mountain bikers riding past this group of MORC dirt bosses (Drew Diller, Jeff Leech, Porter Million, Reed Smidt) on Friday night on the far west loop of the Carver Lake Park Off-Road Cycling Trail, it probably looked like they were discussing the best place for a picnic. Only partially true.

Carver Lake Park, west loop, playground Jeff Leech, Reed Smidt, Drew Diller, Porter Million Porter Million, Jeff Leech, Reed Smidt, Drew Diller Future site of picnic area
They were mainly doing planning for an elaborate technical feature in an area called the Playground, using many of the logs that the City of Woodbury graciously piled nearby at their request.  Photo on the right: that’s where they’re planning to eventually put a picnic table.

[Apologies to the young whippersnappers reading this who are all WTF? about the title of the blog post. My geezerly brain sometimes shifts to ancient song lyrics like this one when I have to think of a title.]

Trail work

Porter Million with SWC-TV crew Porter Million with SWC-TV crew Porter Million with SWC-TV crew
Back in June when I blogged the Anatomy of a MORC MTB trail work crew: reshaping corners at Carver Lake Park, I also took a few photos of MORC Dirt Boss Porter Million being interviewed by a film crew from SWC-TV who was working on a show for the City of Woodbury’s magazine-style program called Woodbury Citystyle.

The video of the show is now available online. Intro text:

Minnesota Off-Road Cyclists takes care of several off road bike trails in the Twin Cities area. Every Wednesday evening they meet at Carver Lake Park in Woodbury MN and take care of the Carver Lake Bike Trail.

httpv://vimeo.com/69473349

Media Trail work

Those of us who love to ride have endured a miserable spring here in the upper midwest, with the trails closed due to wet conditions as often as they’ve been open.  The weather has also taken its toll on the trails indirectly because so many of the weekly work crew maintenance sessions have had to be cancelled.

So with the weather cooperating last Wednesday night, I followed a MORC work crew at Carver Lake Park Off-Road Cycling Trail in Woodbury while they reshaped several corners.

Porter Million and Matt Walkowiak Matt Walkowiak Matt Walkowiak and Porter Million Porter Million and Matt Walkowiak
This section of the trail had become hazardous because it’s at the end of a relatively fast downhill. Riders were often hitting the tree or sliding out trying to go around it on the left. MORC Dirt Boss Porter Million and Matt Walkowiak removed the tree, and then dug up a lot of roots and moved a significant amount of dirt to both make a small berm and provide two places for rain water to flow away from it.

L to R: Ray Schwarz, Jeff Leech, Viv Jones, Aron Braggans Viv Jones and Aron Braggans Aron Braggans Viv Jones
Matt Walkowiak, Zach ?, William Sweasy 11-DSC01314 Zach ? and William Sweasy
Meanwhile, the rest of the crew was shoveling, hauling, and hand tamping a lot of dirt to build up three troublesome, off-camber, eroded corners on another section of the trail.

Foreground L to R: Jeff Leech, Viv Jones, Porter Million, Drew Diller, Zach ? Porter Million Foreground: Zach ? and William Sweasy
With a couple of coaching sessions from Porter, the crew reshaped the problematic corners into berms. I later emailed Porter for an explanation and he wrote:

These berms were carefully constructed to avoid puddling in the instance of rain. By taking the slope of the turn into consideration, and by also adding a roller, the crew was able to design the berm to direct any water flow to a specific drainage area off the trail. By adding the properly constructed berms to this section, a rider should be able to carry their speed through the turns, and have less fear of washing out on what use to be a couple of loose, off-camber turns.

Viv Jones, Ray Schwarz, William Sweasy, Drew Diller, Zach ? L to R: Porter Million, Zach ?, Drew Diller, Matt Walkowiak, Aron Braggans, William Sweasy, Viv Jones, Jeff Leech, Ray Schwarz, Joel Hampton
And the crew saw everything that they hath made, and behold, it was very good. Right photo, L to R: Porter Million, Zach ?, Drew Diller, Matt Walkowiak, Aron Braggans, William Sweasy, Viv Jones, Jeff Leech, Ray Schwarz, Joel Hampton

Trail work

Businesses Photo album Trail work

Chance Glasford, Eagan Bike Park build day Eagan Bike Park build day Eagan Bike Park build day
MORC board member Chance Glasford orchestrated a dozen volunteers yesterday for a big build/rebuild of the MORC pump/jump park in Eagan (Facebook page link).  His May 6 blog post set the stage:

This coming Saturday will be the first major build day at the Eagan Bike Park, the newest addition to the MORC riding facilities. The park is currently about 80% complete after all the hard work from the volunteers last year. The original group of volunteers approached MORC and asked if MORC would like to partner with the City and help take this Bike Park to the next level and fulfill its true potential.

The answer was “Yes” and now is the time to act! There will be a Mini-Excavator, Skid Steer and gas plate compactor on site to speed up the building, but a majority of the work will still need to be done by hand. Please come help make the first bike park in the Metro area a success! Dress for trail work, wear closed toed shoes and bring gloves. (continued)

Mark Gavin, de-berming at the Eagan Bike ParkWhen I wasn’t learning the art of de-berming from MORC board member and treasurer Mark Gavin, I periodically took photos of the amazing transformation. 

I could only be there from 9-noon so I’ll try to get back there in the next day or so and take some more photos to show the end-of-build-day results.

See my large slideshow of 3 dozen photos (recommended) or SLOW CLICK this small slideshow:

Photo album Trail work

I joined a crew of MORC / Lebanon Hills volunteers last night as we did some berm repairs, removed downed trees and branches from the trails, and improved a small jump line.  The trails are still too wet to ride.

Leb trail work May 7 2013 - berm repair Leb trail work May 7 2013 - jump repair 
These screenshots are from short Vine videos that Dirt Boss John Lundell took that night. I’ve linked them to the originals.

Trail work

I first fell in love with mountain biking when, out of curiosity, I attended the grand opening of the the Cuyuna Lakes Mountain Bike Trails in the summer of 2011. Within two weeks, I bought a mountain bike, started this blog, joined IMBA, and became addicted to the sport.

Cuyuna Lakes Whiteout 2012, Beginner class; photo by Aaron Hautala Haul Road, Yawkey Unit Tugger, Yawkey Unit

My love affair with Cuyuna further intensified when I first rode (and raced) a borrowed fat bike in the snow at the Cuyuna Lakes Whiteout back in March. The Sunday after the race, participants were allowed to ride their fat bikes – one day only– in the Yawkey Unit, my #1 favorite section of the trail system. Heaven!  But only one day?  I couldn’t complain too loudly because I didn’t own a fat bike.

So when I heard earlier this fall that the Yawkey Unit would be open to fat bike riding all winter, I contacted Aaron Hautala, president of the Cuyuna Lakes Mountain Bike Crewand asked him for details on how the new policy came to be.  He fed me bits and pieces of the year-long process and I decided to pull it all together into a blog post because it’s a story of perseverance and collaboration among private and public interests, all for the good of the sport, the natural environment, and the local economy.

Gary Sjoquist and Jenny SmithIn late summer of 2011, one of the key people behind the creation of the Cuyuna Lakes Mountain Bike TrailsQBP Director of Advocacy Gary Sjoquist, suggested to DNR staff at the Cuyuna Country State Recreation Area (CCSRA) that the trail system would be a good place to pilot winter fat biking, given the rapid growth of the activity around the country.

Jenny Smith Letter to DNRIn the fall of 2011, Jenny Smith, owner of Cycle Path and Paddle in Crosby,  sent a letter to the DNR asking that Cuyuna’s trails be opened in the winter to allow snowshoeing in the park. While her letter didn’t specifically ask for winter fat bike access, she made the economic argument that the successful introduction of mountain biking in the warm months could be extended into the cold months with other winter activities besides cross country skiing.

On October 25, the CCSRA Advisory Council unanimously passed the following motion:

To explore funding opportunities to pilot a “Winter Tourism Package” for the CCSRA to allow winter biking, snow shoeing, skiing, and access to parking beginning in December 2011 in order to provide an economic boost to an area negatively impacted by the recession. Motion was made by Representative John Ward and seconded by John Schaubach.

Steve Weber, DNR Manager of the CCSRA, began exploring the options for a winter trail program with his DNR colleagues. In an email to them, he wrote:

CCSRA Winter Riding mapSteve WeberIt became apparent early on that the majority of our existing mountain bike trails are too narrow and steep for winter mechanized grooming. However, I do believe there are some winter riding possibilities on the existing mountain bike trail but that is going to require a lot more research and testing before we can offer it to the public. Time permitting, perhaps we can do some testing on that this winter… After some research, I discovered the perfect area for a winter bike trail and conceptually designed a trail in the Sagamore Unit.

Steve showed the Sagamore Unit trails to local Cuyuna Lakes Mountain Bike Crew(CLMTBC) members who were gung ho about the plan and offered club assistance.  His plan for a pilot project to see if there was desire and ability to open this unit up to winter riding in the future was approved by Courtland Nelson, Director of the Division of Parks and Trails. Plans were then made to brush the trails immediately and to secure the equipment necessary for grooming the trails in the winter. A group of CLMTBC riders began regular riding of the entire trail system to identify which trails and units would be best suited—experience and safety—for winter biking.

Nick Statz, Yawkey Unit; photo by Aaron Hautala Cuyuna Lakes Whiteout 2012

As the winter of 2011-12 set in, CLMTB club members began talking up the idea of a winter cycling event, and the Cuyuna Lakes Whiteout was born. The race for the event was held in the Sagamore Unit and the Yawkey Unit was opened up for a one-day winter pass which CLMTBC promoted with this video:

httpv://youtu.be/ThlpM9FKzVw

CLMTBC riders had identified the Yawkey Unit very early on as ideal for year round riding because its:

  • Trail footprint is manageable to maintain, groom.
  • Trails provide a great experience for riders: scenery, range of difficulty and elevation
  • Trails provide a challenge on a fat bike all within feet of each other.

In April of 2012, CLMTB proposed to the MN DNR and the CCSRA Advisory Council that the Yawkey Unit be open year-round. In November, the plan was approved: the Yawkey and Sagamore units would be open all winter, with Sagamore to be groomed by the MN DNR and Yawkey to be groomed by CLMTBC and area snowshoers.

Brainerd Dispatch article on fat biking  Cuyuna Lakes Whiteout 2013

On Dec. 28, the Brainerd Dispatch featured a front-page photo of CLMTB members Aaron Hautala and John Schaubach riding in Yawkey, along with a brief paragraph explaining the winter riding rules.

So props, kudos, and high-fives all around to CLMTB, the MN DNR, and the CCSRA Advisory Council for making this happen.  I expect to be riding Yawkey and Sagamore next weekend and I’m all signed up for the Cuyuna Lakes Whiteout coming up in March.

Here are some recent CLMTB videos of riding fat bikes this winter in Yawkey and Sagamore:

httpv://youtu.be/fuIP89f5mc0

httpv://youtu.be/LcSX-RixeBk

httpv://youtu.be/2FC0a9Yd5C8

Trail work Trails

Back in April, I blogged about the opening of the pump and jump park in Eagan, adjacent to the skate park at the Lexington-Diffley Athletic Fields (Google map here).

The idea of a pump track is to ride it around and around without pedaling. As I wrote back then, on my first stint, I was able to eventually get around the beginner track on my 29er hardtail. Hard work but fun, once I got the hang it.

When I rode Lebanon Hills a few days later, I noticed that I was able to transfer my newly acquired and modest pumping skills to the rollers there. I was pleased.  I did a couple of more sessions on the beginner pump track before I went to Cuyuna Lakes MBT Festival in June.  I was ecstatic.  I could not believe how much more fun it was to ride Cuyuna’s roller-infested flow trails.  Every little rise and dip in the trail became an opportunity to accelerate without pedaling.

Chance Glasford at the Lexington pump parkIn late June, I took some photos of Chance Glasford as he zipped around the intermediate and advanced Lexington pump tracks on a 24 inch BMX bike.

(Chance is a MORC member, author of the Self-Sponsored Cycling blog, and the leader of the construction of Eagan’s pump and jump park.)

Chance Glasford at the Lexington pump park Chance Glasford at the Lexington pump park Chance Glasford at the Lexington pump park Chance Glasford at the Lexington pump park
Chance could get going so fast that he could manual over two rollers at a time and fly over the table-top jump (right photo above) on the advanced pump track.

I haven’t figured out how to pump the berm to keep my speed up. Chance is doing this in the left photo above where you can see he’s coming out of the berm with enough speed to manual over the two rollers that follow it.

Lebanon Hills: rollers, jumps, berms  Lebanon Hills: 21 rollers
Earlier this month I put my new pump skills to the test on the 21 rollers at Lebanon Hills (left side of the open field on the beginners loop).  After a couple of runs of flying down them without braking, I decided to try to manual over a couple of the rollers.  I picked a couple of spots where the rollers were closer together, scrubbed off some of my speed, and voila!  Too fun.

I don’t know if I’ll be able to completely pump my way around the intermediate track at Lexington, as my 29’er is not the best pump park bike.  The big wheels are a lot to pump.  I might get a 24-inch BMX or trials bike. But in the meantime, I can see how regular stints at the pump track will improve my riding.

loose sand and gravel on the Lexington pump track sweeping the loose sand and gravel on the Lexington pump track
Another surprise: pump tracks need to be swept regularly (loose sand and pebbles accumulate) and then watered down. Chance showed me how to do the maintenance of the beginner’s track last Friday eve.

There are many ‘how to pump’ videos out there, but so far, I like these two:

1. Lee McCormack and Chris Powell coaching high schoolers:

httpv://youtu.be/7Vl80yZ0O-g

2. ZEPTechniques:

httpv://youtu.be/B7AjsUhsD2U

Learning to ride Trail work

Half of the Lebanon Hills trail crew, April 24, 2012Last Tuesday I joined a MORC / Lebanon Hills trail crew working on the XX rock gardens and was amazed at what was accomplished in two hours.

I only took one photo that night (right), and that was just half of the 20+ people who showed up to work from 6-8 pm. So this week I went back for round 2 to chronicle the follow-up work with photos.

A MORC mountain bike trail work crew is typically organized by the Dirt Bosses for the trail. One of them announces the date and time in the MORC forum for that trail, inviting others to sign up.  When I saw this April 23 invitation by John Lundell, one of the Lebanon Hills Dirt Bosses, I just had to go since I love Leb’s rock gardens:

We will continue our efforts in the XX rock gardens this week. Meet in the parking lot (assume trail will be open) – everyone is welcome! Post up if you can make it. Crew leaves the lot promptly at 6pm so if you are coming late let us know.

First lesson I learned: you don’t ride your bike to the work location on the trail.  The Dirt Bosses bring all the tools for the job but you’re expected to help carry them.  So everyone walks in. They recommend long pants, gloves, boots, and eye protection.  Newbies are given a short safety chat on handling the sharp tools.

The task for the crew on this project was to add some difficulty and options to a couple of Leb’s double X rock garden areas. One of the hallmarks of good mountain bike park is that it’s constantly changing, drawing riders at all levels back for new challenges.  Leb excels at this and last year’s addition of a huge advanced beginner’s loop is but one example.

Worker bees like me on last week’s crew spent much of our time digging out boulders from the wooded areas around the XX portion of the trail and rolling them downhill (bowling?) for the ‘architects’ to place.  While the Bosses have a general idea of what they’re trying to accomplish, everyone’s input is considered because the terrain and available rocks require creativity. “We’re making this up as we go” is the modus operandi.

New lines for a double X section at Lebanon Hills New lines for a double X section at Lebanon Hills Double X section work crew at Lebanon Hills, May 1, 2012
The photo on the left shows what was accomplished after this week’s session with one section of the trail. The green arrow indicates where the only option was originally.  The red arrows indicate four new options, with varying levels of difficulty.

In the center photo, the green arrow shows the original more difficult line down the rock.  The red arrows show two new challenging lines down the rock steps.  Previously, that line was quite easy.

For a closer look at the process, see the large slideshow of 40+ photos (recommended) or SLOW CLICK this small slideshow:

Photo album Trail work