Tag: <span>Adam Harju</span>

Last Thursday and Friday, I attended the IMBA Midwest Fat Bike Access & Grooming Workshop in Cable WI, a gathering of practitioners devoted to improving off-road cycling and fat biking in winter.

QBP  MORC logo 200 IMBA CAMBA
The event was sponsored by QBP and hosted by Minnesota Off-Road Cyclists (MORC), International Mountain Bicycling Association (IMBA), and the Chequamegon Area Mountain Bike Association (CAMBA).

John GaddoDSC06075  Cold Rolled

Following a late Thursday afternoon/evening fat bike ride by approximately 15- 20 riders on the newly groomed Esker trail in the CAMBA trail system’s Cable cluster, participants gathered for the opening reception at the Lakewoods Resort. QBP’s John Gaddo showed Cold Rolled, the  documentary by Clear & Cold Cinema featuring the 15-mile winter singletrack Snow Bike Route (SBR) that’s part of the Noquemanon Trails Network in Marquette, Michigan.

Events Photo album

Hansi Johnson on Piedmont MTB trail Hansi Johnson observing the reconstruction of Haines Road Hansi Johnson's salute to the 'side effects' of the reconstruction of Haines Road

The day after my solo stint at Spirit, I met up with IMBA Midwest Regional Director Hansi Johnson for a ride on the COGGS Piedmont trail over to the new Brewer Park trail under construction. On way, we encountered MNDOT’s reconstruction of Haines Road which was wiped out by last year’s flood. For some reason, MNDOT has take down a huge chunk of the hill/cliff overlooking a section of the road and with it, a large section of the Piedmont trail. If you look closely at the photo of Hansi on the right, you can see how he feels about this.

Hansi Johnson, Adam Harju Hansi Johnson, Larry Sampson Brad Miller, Hansi Johnson

After making our way around the, um, destruction, we came upon a COGGS trail building crew working on the new Brewer Park trail, led by Adam Harju and Brad Miller, with assistance from Larry Sampson, Duluth Maintenance Supervisor for the Superior Hiking Trail Association. Here’s some background from a COGGS blog post:

Along with the work funded by the Legacy grant, COGGS also has it’s own mechanized trail building crew. Thanks to a $10,000 grant from Specialized Bicycles, COGGS was able to purchase a Bobcat 418 mini-excavator and a CanyCom mechanized wheel barrow. To operate this equipment we hired Adam Harju, Brad Miller and Pete Leutgeb.

Their first project was building two reroutes of the existing singletrack on the east side of Amity Creek and have since turned their efforts towards building a portion of the Duluth Traverse Trail through Brewer Park. This section of land is immediately across Haines Rd west of Piedmont and has perfect terrain for mountain bike trails. This section of the DT will connect Piedmont to the State Trail and DWP, which are both off-road, multi-use trails that a rider can take all the way to Beck’s Rd in West Duluth.

20131002_151825 20131002_143355 20131002_143434

20131002_143411 20131002_143631 20131002_144029

Members of the College of Saint Scholastica track team were volunteering, hauling many wheelbarrow loads of dirt to the Brewer Park MTB trail construction site a couple blocks away. Jeesh.

20131002_144231 20131002_144415 20131002_144421

“Thanks to a $10,000 grant from Specialized Bicycles, COGGS was able to purchase a Bobcat 418 mini-excavator and a CanyCom mechanized wheel barrow.”

People Trail work Trails