Tag: <span>John Lundell</span>

Riding Section 1 at LebLast week I blogged about my technical scheme to mark up sections (alternative lines) through rock gardens. I set up two sections at Lebanon Hills later in the week, another four on Sunday, and revamped one of them yesterday after some feedback from Leb Trail Steward John Lundell.

So far, using white chalk to mark the rocks and flags to mark the entrance and exits has worked to set up the sections. It’s easy to move flags and the chalk marks can be removed by rubbing dirt on them.

I’ve not yet gotten much feedback yet to know if it’s working for riders. And it’s not rained, so I’ve not had to re-chalk.

The six videos all start with photos of the sections marked with red lines to make the alternative lines visible. Then there’s a clip of me riding the section.  I recorded the videos using my smartphone mounted on a small tripod, usually placed on the ground. Most of the sections required me to capture video from two or three different vantage points. The upshot of that? You see me cleaning everything but you don’t see a non-stop video of me cleaning entire sections from start to finish. Have I cleaned every section from start to finish? Not yet.  The videos also don’t include any of my many failed attempts and crashes.

All the videos are short, varying in length from 12-39 seconds.  Attach a comment if you’ve got questions or feedback.

Section 1:

httpv://vimeo.com/72477908

Section 2:

httpv://vimeo.com/72478391

Section 3:

httpv://vimeo.com/72616040

Section 4:

httpv://vimeo.com/72619804

Section 5:

httpv://vimeo.com/72620228

Section 6:

httpv://vimeo.com/72620498

Trail work Video

I joined a crew of MORC / Lebanon Hills volunteers last night as we did some berm repairs, removed downed trees and branches from the trails, and improved a small jump line.  The trails are still too wet to ride.

Leb trail work May 7 2013 - berm repair Leb trail work May 7 2013 - jump repair 
These screenshots are from short Vine videos that Dirt Boss John Lundell took that night. I’ve linked them to the originals.

Trail work

IMG_20120328_175443John Lundell  announced in the MORC forum on Wed. morning that Lebanon Hills was open for mountain biking. I got there around 5:30 and the parking lot was full.

The intermediate and expert trails were in spectacular shape. No ruts at all that I saw. And here’s John’s explanation for why it worked so well:

For those that got out and rode today, hopefully you noticed that the trail was opened well before it was bone dry. As we hiked around yesterday and this evening you can see a lot of dampness in the trail… it could maybe have stayed closed a while longer, but early in the year we like to open it up a little early to get a nice pack-down before the rains hit.

I say this as I know some think we enjoy closing or keeping the trails closed.. not sure why people have that impression as we love to ride too and will always keep you out there enjoying the trails as much as possible.

The entire Leb trail crew thanks everyone for being patient during what was a crappy winter for riding, an extended closing, but an early season opening. Damage was kept to a minimum and that keeps us focusing on other trail repairs, new trail features etc. rather than rut fixing.

IMG_20120328_184850 IMG_20120328_184807 IMG_20120328_190114 - Copy
All the trails had been cleared of downed branches, as well some big trees (left and center photos above). I cleared small sticks and branches as I went along. I snipped a few buckthorn trees and branches in the rock garden just after Tedman’s Curve (right photo).  There’s a tougher option to ride high on the left. I can sneak through to the left of the tree (red arrow) but I’m nowhere close yet to getting over the rock (yellow arrow) as the approach is very steep and there’s no room to get a run at it.

As I wrote in the forum, I can’t believe how lucky I am to have a place like this to ride that’s only 30 minutes from my house.

Trails